About Our Factory




Production
| Production Line | We have total 14 sewing Lines in ASHULIA at this moment. |
|---|---|
| Products | T-Shirt, Tank Top, Polo Shirt, Shorts, Denim, Twill Pant, Cargo Pant, Leggings, Tops, Inner Wear, Polar Fleece etc. |
| Number of Workers & Staffs | 700 Persons. |
| Production Capacity |
6,50,000 Pcs/Month T-Shirt – 30,000 Pcs Per Day Polo-Shirt – 25,000 Pcs Per Day Inner Wear – 45,000 Pcs Per Day Ladies Tops (Woven) – 22,000 Pcs Per Day Leggings – 35,000 Pcs Per Day |
| Lead Time | 60 to 90 days upon confirmation of orders with all other details. |
Production Process
Bonded Warehouse
Fabric & Accessories
Sample With CAD Garber Software
Cutting
Print Embroidery
(If Necessary)
Sewing
Inspection
Iron
Final Inspection
Get Up Inspection
Measurements
Hang Tag Attachment
Needle Inspection
Folding
Poly
Carton
Safety & Facilities
- FIRE DOOR
- FIRST AID
- WATER RESERVER FOR FIRE FIGHTING
- MEDICAL FACILITY
- EMERGENCY TELEPHONE NO
- CHILD CARE ROOM
- FIRE EXTINGUISHER
- EMERGENCY LIGHT
- PRAYER PLACE
- FIRE FIGHTING EQUIPMENTS
- LOADING / UNLOADING
- SECURITY SYSTEM
Utility
| MAIN POWER | 315KVA, 11KV REB Connection |
|---|---|
| STAND BY POWER | 315 KVA & 400 KVA 2 NOS DIESEL GENERATOR |
| BOILER | 500 KG GAS BOILER |
| DISTRIBUTION LINE | BUSBAR TRANKING SYSTEM (BBT) – EAE BRAND |
Machine List
| KNITTING SECTION | |
|---|---|
| Knitting Machine | 03 Nos. |
| CUTTING SECTION | |
| Cutting Table | 03 Nos. |
| Straight Knife | 05 Nos. |
| FINISHING SECTION | |
| Iron Table | 14 Nos. |
| Needle Detector | 01 Nos. |
| SAMPLE SECTION | |
| Sewing Machine | 20 Nos. |
| UTILITY SECTION | |
| Sub-Station | 01 Nos. |
| Generator | 01 Nos. |
| Boiler | 01 Nos. |
| Compressor | 01 Nos. |
| SEWING SECTION | |
| Sewing Machine | 438 Nos. |
| Elastic Joint | 01 Nos. |
| Re-cone | 01 Nos. |
3D VIEW OF FACTORYFLOOR PLAN – FIRST FLOORFLOOR PLAN – GROUND FLOORFLOOR PLAN – UTILITY